September LUP 9/26/2011 Attending: Marvin Massey, Paul Anderson, Steve Lenz, Steve Reimer and Public Works representative, Zach Steele. Work session began @ 4:30 pm Meeting called to order @ 5:09 pm Minutes of the last meeting were approved as presented UNFINISHED BUSINESS A. Southside Meadows-Sheryl Klocker subdivision—Ms. Klocker presented a Final Plat map and a letter requesting (2) variances from the City Council. During discussion LUP weighed in on the following points: 1) LUP asked why the bold print line items #4-9 that were on the Preliminary Plat were missing from the Final Plat—Ms. Klocker indicated these points could be added back into the Final Plat map. 2) Zach Steele on behalf of City Public Works stated that the City would do no maintenance or snow removal on any streets in the proposed subdivision until the time when paving and curb/gutter were completed. 3) Zach also reported that the City required the utilities (sewer line & water line—with curb stops) to be extended to the edge of the property lines on all lots. 4) a) A variance letter was presented by Ms. Klocker requesting (2) free water taps and (2) free sewer taps be given to them by the City in exchange for the Klocker's paying for and extending approximately 1000 feet of water line. b) Ms. Klocker also requested a variance for permission to sell a majority of the subdivision lots prior to fulfilling the mandated paving/curb & gutter. The request included a (3) year cap that stated whichever came first; the majority of the lots sold or the passing of three years, the paving will be completed at the end of three years. Ms. Klocker will also put money into a paving escrow on each lot sold so there will be money designated for the project's completion. Paul A. moved to approve the two variances as presented. Steve R. seconded. All in favor, motion passed. Paul A. moved to approve the Final Plat if line items #4-9 from the Preliminary Plat were included on theFinal Plat Map. Steve R. seconded, all in favor, motion passed. . . ' NEW BUSINESS B. Crook County Fairboard-20X50 Concession Stand & Bathrooms g fairgrounds. Paul A. moved to approve, Steve R. seconded, all in favor, motion passed. C. Randy Gill remove existing sidewalk & install a 50' retaining wall in its place w/stairs and sidewalk extending into the Gill property. Paul A. moved to approve as long as the retaining wall is located on the Gill property line and with Public Works locating the property line pins. Steve R. seconded, all in favor, motion passed. A. Eldon Mollenbrink-28 X 16 extension to existing garage @ 220 N. 6th St. Discussion was held as to the current location of the existing garage in relation to the required setbacks from Oak St. LUP will not approve proposed construction on lot lines or structures to be located on property where setbacks requirements are not met. Steve R. moved to not approve the building application as presented since it does not meet city setbacks. Paul A. seconded, all in favor, motion passed. NOTE: If Mr. Mollenbrink would resubmit a new permit with the proposed plan for a garage extention that meets all setbacks, LUP gives Public Works the authority to approve the application before the next LUP meeting. D. PreCorp remove old approach, install a new culvert, and concrete paved approach at the PreCorp East yard on Govt. Valley Rd. Paul A. moved to approve, Steve L. seconded, Steve R. recused himself due to a possible conflict of interest. All in favor, motion passed. E. PreCorp—retaining wall andflower bed/planter in alley behind Main Office building. Paul A. moved to approve, Steve L. seconded, Steve R. recused himself due to a possible conflict of interest. All in favor, motion passed. Meeting adjourned at 5:50 e .. Minutes prepared b e 4 on September 28, 2011 e Lenz