LUP Meeting June 29,2015 City Counsel Chambers Members Present: Steve Lenz Bonnie Beaudoin caUie Hilty Joseph Lambert Joe Wilson Members Absent: None Work Session At 4:30pm the work session began. The commission reviewed documents concerning old business items, new business items and the May 18, 2015 LUP meeting minutes. Meeting At 5:00pm Steve Lenz called LUP meeting to order: Also Present: Stan Reiman Lee Wollen Gregg Dittman Brian Wells John Rogers Approval of Minutes Motion: Callie Hilty moved to approve the minutes of the May 18, 2015 LUP Meeting as submitted with no changes or additions, Bonnie Beaudoin seconds. Vote: 5 in favor,0 opposed Resolved: Motion carried Old Business A. Gregg Dittman had submitted an application to add-on/remodel the existing car wash at 51* E. Cleveland Street at the previous May 18, 2015 meeting. The commission had many questions and requested a more detailed site plan. A detailed site plan was not submitted but Gregg did discuss with us his plans,which are close to the plans discussed at the previous meeting. • The new east wall of the automatic wash bay (replacing the current open/outdoor bay) will be 20' from the existing structure east wall and does not extend past the existing concrete pad. • The existing greenhouse shed will be removed. • Cars will enter from the north and exit onto Cleveland Street. • He would like to attach signs to each side (he will apply for a sign permit at a later date). • Concrete or Asphalt surfacing will be installed on the north/entrance • His current application proposed installation of storage units on the north and west side in the rear half of the lots. The property lies in the General Business District which does not allow for storage units(self-storage warehouse). Motion: Bonnie Beaudoin moved to recommend to the City Council to approve the building application for the car wash addition. Joseph Lambert seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries B. The commission is in the process of reviewing the Floodplain Permit assembled by the City. Motion: Bonnie Beaudoin moved to table the review for another month. Callie Hilty seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries New Business A. Brian Kerkvliet has submitted an application to replace an existing 8x8 shed with a new 8x8 shed at 630 Ryan Street. Motion: Callie Hilty moved to recommend to the City Council to approve the shed application. Joseph Lambert seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries B. Wendy Kipp has submitted an application to install a modular home at 617 South 2nd Street. The application has been pre-approved. Motion: Bonnie Beaudoin moved to recommend to the City Council to approve the modular building application, Callie Hilty seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries C. Joe Wilson has submitted an application to install a single wide mobile home at 729 Theatre Road. The application has been pre-approved. Motion: Callie Hilty moved to recommend to the City Council to approve the mobile home application. Bonnie Beaudoin seconds. Vote: 4 in favor,0 opposed,Joe Wilson abstains from vote Resolve: Motion carries D. Lee Wollen came to speak to the commission about his interest in purchasing two lots in the Kaski Subdivision; one with a home on the lot and the adjacent vacant lot. His question pertained to whether or not he could install a large shop for personal used on the adjacent lot. He said he had previously spoke with the county and they say no homeowner's association has ever been set up for the Kaski Subdivision. The commission does not regulate the issue at hand but recommended to Lee to speak with the surrounding landowners. E. Stan Reiman has submitted an application for the installation of a 12x24' Storage Shed with High side of 17'. The shed has already been installed prior to the application. Stan informed the commission on the situation; 8 years ago on his north property line there was a retaining wall that held a shed that was on the north property line that was falling apart. There were a lot of bushes at this location as well. He removed the old retaining wall and the bushes at this time. Since then a new railroad tie wall has been constructed with the vertical ties on the property to the north and the horizontal ties on his property to the south of the line. He states that this was done in agreeance with the neighbor to the north. The current shed sits 15" off of his northerly property line, he is asking for a variance from the setbacks on this northerly line. Motion: Bonnie Beaudoin moved to recommend to the City Council to approve the variance request for the northerly setbacks and approve the shed application. Joe Wilson seconds. Vote: 4 in favor, 1 opposed Resolve: Motion carries F. Brian and Connie Wells have submitted an application to replace their existing failing deck with a concrete patio and pergola as well as widen their sidewalk with this construction. His current plan was to entirely cover the proposed patio which is within 2 feet of his side property lines. The commission informed Brian that he may not build a structure within 10 feet of his side property lines. Brian will redesign his pergola and submit the plan at a later date. Motion: Callie Hilty moved to recommend to the City Council to approve the concrete patio building application. Joe Lambert seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries G. John Rogers came to speak with the commission about the installation of storage units on his property at 912 South 4th Street. The commission informed John that the site is currently zoned as High Density. Residential which does not permit the installation of storage units (self-storage warehouse) and that a zoning change request would have to be submitted with the council for this. Discussion was had on the impact on traffic flow in the remote location in town and the surrounding neighbors' opinions. John is planning on getting on the Council agenda to see the thoughts of the Council before pursuing this any further. H. Fred Altaffer has submitted an application for the installation of a 20x120' (12 Unit)Storage Shed on his property at 2714 Highway 585. He does plan to split this tract at a later date with the storage shed lying on the south half of the property but this is not addressed in this application. The tract is zoned Highway Business District which allows for the installation of a storage shed (self-storage warehouse). There are no setback violations with this installation. Motion: Callie Hilty moved to recommend to the City Council to approve the storage shed building application. Bonnie Beaudoin seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries I. Colton Lenz has submitted an application build a boardwalk (wooden sidewalk) on his property at 513 E. Ryan Street. The construction does not change any of the current setbacks on his property. Motion: Callie Hilty moved to recommend to the City Council to approve the building application. Bonnie Beaudoin seconds. Vote: 4 in favor,0 opposed,Steve Lenz abstains from vote Resolve: Motion carries J. Reggie Gaylord has submitted an application build a deck on his property at 218 Canyon Road. The closest property line to the new construction is 25',therefore there are no setback violations. Motion: Joseph Lambert moved to recommend to the City Council to approve the building application. Bonnie Beaudoin seconds. Vote: 4 in favor,0 opposed,Steve Lenz abstains from vote Resolve: Motion carries K. Lavona Morey has submitted an application to reconstruct a deck and replace steps at 116 West Main Street. Motion: Callie Hilty moved to recommend to the City Council to approve the building application with the condition that Mac Erickson or one of his employees verifies that the construction is not within the 10' side property setback. Bonnie Beaudoin seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries L. Todd Beagle has submitted an application to construct small section of fence to define the corners of his property at 11th and Warren Streets. The property is on Sundance Creek and is within the floodplain or the floodway. Motion: Callie Hilty moved to recommend to the City Council to approve the fence building application with the condition that the property is in the Floodplain NOT the Floodway. Bonnie Beaudoin seconds. Vote: 5 in favor,0 opposed Resolve: Motion carries M. Kenny Rathbun with Bearlodge Engineering and Surveying is here to give the commission an update on the Croell Phase II Project. The Wyoming Business Council has approved to install sewer main adjacent to the water main that was installed during the Phase I Croell Project. Phase II includes installation of the above sewer main as well as water and sewer services to the lots adjacent to this construction (lots between Croell Drive and the properties to the northwest). Roger Croell has another contract with the City where he agrees to pay the "local match" portion of the Wyoming Business Grant as with Phase I. Roger has not platted (subdivision plat) in this area. The permit for the construction of this project has been submitted to DEQ for approval. Roger Croell will either need to dedicate street row or easement over the new sewerline. 7:15—No more business.-Meeting Adjourned. Minutes prepared by: Callie Hilty on July 3, 2015.