• ORDINANCE NO. 5, 1987 AN ORDINANCE REGULATING STREETS; USE OF; SETTING OF DIRECTIONAL DESIGNATIONS; AND THE OPENING AND EXCAVATION OF STREETS AND.ALLEYS; REQUIRING A PERMIT AND FEE; IMPOSING REQUIREMENTS; PENALTIES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF SUNDANCE, CROOK COUNTY, WYOMING: Chapter 3: THIS ORDINANCE IS ENACTED TO PROVIDE FOR THE PUBLIC SAFETY AND TO REGULATE CONSTRUCTION IN, AND USE OF, THE PUBLIC STREETS SECTION 1: GENERAL REGULATIONS 3-1-001 DEFINITIONS a. Applicant: Any person making a written application to the Town of Sundance for a permit hereunder on forms provided by the town. b. Contractor: Any person who has been granted and has in force a permit issued hereunder. c. Excavation work: The excavation and other work permitted under an excavation permit and required to be performed under this permit and where a trencher, backhoe, boring machine, jack hammer, cable plow or any other method or equipment is used to do such work. d. Street: Any street, alley, highway, avenue or other public way dedicated to the public and operated by the town. e. Boulevard: That• portion of a dedicated street between the property line and the edge of the traveled way. f. Sidewalk: A buildup of material at or above ground level as a walkway for pedestrians at the side of a street. 3-1-002 OCCUPANCY OF STREETS UNLAWFUL It shall be unlawful for any person to fence off or in any other way restrict the public use of streets in any way not specifically authorized by ordinance. This applies to undeveloped, as well as, developed streets. 3-1-003 ASSIGNMENT OF DIRECTIONAL DESIGNATIONS • The streets of the town shall have North-South and East -Hest designations as follows: . i. All north -south streets north of Cleveland Street shall have a North designation and all those south of Cleveland Street shall have a South designation. it. All east -west streets north of., and including Cleveland Street shall have an East designation if they are east of West Street and:a West designation if they are west of West Street. iii. All east -west streets south of Cleveland Street shall have an East designation if they are east of 1st Street and a West designation if they are west of 1st Street. • 3-1-004 STREET NAMES Official street names shall be those shown on the official town map as may be adopted by the town council and as may be changed from time to time by the town council. 3-1-005 BOULEVARDS - MAINTENANCE AND USE OF Boulevards shall be maintained by the abutting property owner. The boulevard may be used as an extension of the abutting property owner's yard. No structures, either permanent or temporary, may be placed at any place on a dedicated street. 3-1-006 BOULEVARDS - TREE AND SHRUB PLANTING Trees and shrubs may be planted in the boulevard subject to the following restrictions: i. On corner lots nothing other than grass may be planted on the angle formed by the extension of the two property lines. it. On streets with less than a sixty foot dedication, no trees or shrubs will be planted on the boulevard. iii. On streets of le than sixty feet dedicated width, trees and shrubs may be planter) but must be within a distance of 10 percent of the total dedicated width from the property line. 4( iv. On corner lots no shrub of more than three feet in height will be allowed within fifty feet of the point of intersection of;the two street lines. 3-1-007 BOULEVARDS - ABUTTING PROPERTY OWNER RESPONSIBLE FOR TREES AND SHRUBS The abutting property owner shall be responsible for all trees and , shrubs on the boulevard and shall keep them trimmed in such a manner: ass to not interfere with sight of drivers of vehicles ,and to protect the public safety. 0 3-1-008 BOULEVARDS - TO{':N MAY ORDER TRINNING AND/OR REMOVAL OF TREES AND SHRUBS If, within thirty days of receiving written notice from the town that trees or shrubs need to be trimmed or removed, the property owner has not complied with the written notice, the town will order the wort: done and the property owner shall be billed for the cost of such work. 3-1-009 SIDEWALKS - PERM:IT REQUIRED No person shall construct, reconstruct or remove sidewalk within the town without a permit from the town on a form provided Liy the town. 3-1-010 SIDEWALKS - PERMIT I•'EE The fee for a sidewalk construction permit shall be as established from time to time by the town council by resolution and shall be paid at the time of application. If the application is denied, the permit fee shall be refunded to the applicant. 3-1-011 SIDEWALKS - CONSTRUCTION REQUIREMiENTS { • All sidewalks shall beEconstructed in accordance with Section 509 of the Wyoming Public Work`•s Standard Specifications. Sidewalks shall be constructed to a grade as determined by the town. 3-1-012 SIDEWALKS - TO BE MAINTAINED IN SAFE CONDITION Every sidewalk shall be maintained in a safe condition by the property owner abutting the sidewalk. Sudden deviations in grade or slope, cracks or extreme rough surfaces are considered unsafe. 3-1-013 SIDEWALKS - MAY BE ORDERED REPLACED The town shall order any sidewalk it has determined to be unsafe to be replaced by written notice to the property owner abutting the defective sidewalk. 3-1-019 SIDEWALKS - TOWN MAY REPLACE If a sidewalk ordered replaced according to 3-1-013 above is not replaced within thirty days of notice, the town will order the work done and bill the cost of such work to the abutting property owner. 3-1-015, SIDEWALKS - TO BE KEPT CLEAR OF SNOW AND ICE Every sidewalk within the town shall be kept clear of ice, snow or • slush by the abutting property owner whether the lot be vacant or have an occupied or unoccupied building on it. • 3-1-016 SIDEWALKS - TOWN MAY ORDER WORK DONE AND BILL THE ABUTTING PROPERTY OWNER If, after personal contact by a town employee, the property owner has not cleared the sidewalk within 12 hours, the town may order the work done and bill the cost to the property owner. 3-1-017 SIDEWALKS - SALT OR CORROSIVE AGENTS NOT TO BE USED No person shall use salt or any other substance corrosive to concrete as a means to control ice, snow or slush on any sidewalk within the town. 3-1-018 CURB AND GUTTER - PERMIT REQUIRED No person shall construct, reconstruct or remove curb and gutter within the town without a permit from the town on a form provided by the town. 3-1-019 CURB AND GUTTER - PERMIT FEE The fee for a curb and cutter construction permit shall be as established from time toy time by the town council by resolution and shall be paid at the time of the application. If the application is denied, the permit fee Aall be refunded to the applicant. • 3-1-020 CURB AND GUTTER, - CONSTRUCTION REQUIREMENTS All curb and gutter shall be constructed in accordance with Section 503 of the Wyoming Public Works Standard Specifications. Type A curb and gutter as shown in Standard Drawing 503-01 shall be used in,, the built up area of the town with driveway cuts to be built as shown in Standard Drawing 504-02. In a new development where buildings are not present, Tyne B curb and gutter as shown in Standard Drawing 503-01 may be used. Curb and gutter shall be i constructed to a grade as determined by the town. 3-1-021 CURB AND GUTTER - TO BE MAINTAINED IN SAFE CONDITION Every curb and gutter shall be maintained in a safe condition by the!.' property owner abutting the curb and gutter. Sudden deviations in grade or slope, cracks or extremely rough surfaces are considered-, unsafe. 3-1-022 CURB AND GUTTER - MAY BE ORDERED REPLACED The town shall order any;curb and gutter it has determined to be unsafe to be replaced by;written notice to the property owner abutting the defective curb and gutter. i 3-1-023 CURB AND GUTTER'- TOWN MAY REPLACE • If a curb and gutter ordered replaced according to 3-1-022 above is not replaced within thirty days of notice, the town will order the work done and bill the cost of such work to the abutting property owner. 3-1-024 UNPAID BILLS FOR WORK DONE BY TOWN - LIEN MAY BE FILED If, after thirty days have passed since the billing date for work done under 3-1-000, 3-1-014, 3-1-016 or 3-1-023 .above, the bill remains unpaid, the town may file a lien for the amount of the bill plus costs against• the property which shall be collected as any other assessment. 3-1-025 EXCAVATIONS - PERMIT REQUIRED It shall be unlawful for any person, company or corporation to.dig 'in any street for any purpose not authorized by ordinance, without a written permit from the town on a form provided by the town. In an emergency, during non -working hours of the town, upon notification of the town, oral permission may be given to dig but a written permit must be secured the first working day the town hall is opened. i 3-1-026 EXCAVATIONS - PERMIT FEE The permit fee for a street excavation shall be as established from time to time by the town1council by resolution and shall be paid at • the time of the application. If: the application is denied, the permit fee shall be refunded to the applicant. 3-1-027. EXCAVATIONS - PERMIT TO BI: PRESENT ON JOB SITE i The permit shall be on the job site at all times and will be shown to any town employee or official when requested. o 3-1-028 EXCAVATIONS - ASPHALT CUTS Any time asphalt is involved in an excavation, the asphalt shall be machine cut and a square edge cut must be made. 3-1-029 EXCAVATIONS - COMPACTION 4: .. Any time an excavation is made in a street, back fill shall be compacted to meet the surrounding area except when the excavation is, within three feet of asphalt. When an excavation is made under asphalt or within three feet of the edge of asphalt, compaction shall be completed according to specifications of the town administrator. 3-1-030 EXCAVATIONS - CONTRACTOR RESPONSIBLE i The contractor shall be responsible for any settling of backfill .for a period of one year. He must replace any settling immediately upon • notice by the town that an excavation made by him is settling. • 3-1-031 EXCAVATIONS - REPLACING ASPHALT The town will replace asphalt removed in an excavation and the cost of such replacement shall be included in the cost of the permit. 3-1-032 EXCAVATIONS - UTILITY LOCATIONS The contractor shall be responsible for all locations of utilities. 3-1-033 EXCAVATIONS - PROTECTION OF PUBLIC The contractor shall be responsibly: for sufficient barricades to protect the public and shall be responsible to light the excavation if it is to be left open overnight. 3-1-034 EXCAVATIONS - PERMIT NOT REQUIRED Work done by employees of the town or by contractors hired by the town does not require an excavation permit. 3-1-•035 WEIGHT RESTRICTIONS The town council may set weight restrictions for the town streets. 3-1-036 PENALTIES +? • Any person found guilty "of violating any of the provisions of this ordinance shall be deemed guilty of a misdemeanor and shall be punished according to the provisions of Ordinance No. 11 1983. SECTION 2: •REPEALING ALL ORDINANCES IN CONFLICT HEREWITH Any ordinance of the Town of Sundance in conflict herewith be and the same is hereby repealed. SECTION 3: SEVERABILITY Should the Courts of this State or the United States declare any section, provision, paragraph, clause, sentence, phrase or part of this ordinance invalid or unconstitutional or in conflict with any other section, provision, paragraph, clause, sentence, phrase or part thereof of this ordinance, then such decision shall affect only the section, provision, paragraph, clause, sentence, phrase or part thereof declared to be unconstitutional or unauthorized and shall not affect any other part of this ordinance. 0 SECTION 4: PROVIDING FOR AN EFFECTIVE DATE This ordinance shall be effective upon completion of all readings and other acts required by law. by: ATTEST: Town Clerk 1st reading ,lune 1. 1987 2nd reading July 6. 1987 3rd reading September 8, 1987 Publish on Octcber L 1987 4s: p r: n ' N�tY i r f,d4C •.{i N•' r 0 T OF r Mayor NDANCE rr;rr� • a, n'Ld v A SUNDANCE LIONS CLUB PROJECT IN COOPERATION WITH THE CITY OF SUNDANCE • A project undertaken in the mid sixties and continuing to date. Involving the reclassification of streets, and the assignment of appropriate street addresses, and street signing. By mutual agreement the Sundunca Lions Club voluntarily provides the necessary manpower, and the City;•of Sundance pays for the necessary materials. The reclassification of streets, the manner of signing, and the method used in determining street addresses were approved and covered in City Ordinance on file in the office of the City Clerk. Annexed areas not normally sub divided into equal lots, usually •-require a modification of method to achieve a suitable addressing procedure for each development. Annexed areas are considered as extensions of the original project. Annexation CANYON ROAD • At a point common to the approximate convergence of West Beaver Street, Canyon Road, and the west boundary of the alley through block 30 of the Bowman Addition to the Original Townsite, a reference point was established; to be known as Bench Mark #1, Canyon Road= a point of beginning. 1. Using a 10 ft measuring wheel, with counting meter, and begin- ning at Bench Mark #1, measurement began up Canyon Road; to continue as necessary to accomodate the need for access numbers. At the •center of each approach the reading was noted, and that access number assigned. (To translate such numbers into distance in feet, simply add one zero.) 2. Should two approaches be directly opposite each other, arid•con- structed at the same time, the one on the south shall take the next number below center, and the one on the north shall take the next number above the center number common to both. This same procedure will apply to a new approach opposite an existing ones without changing the existing access number. 3. Should there be more than one residence or structure accessed by the same approach, the first served shall add an (A) suffix, the second a (B) suffix etcl the same access number being common to all.