• ORDINANCE NO. 12, 2002 AN ORDINANCE AMENDING ORDINANCE NO. 5, 1987, THE OPENING AND EXCAVATION OF STREETS AND ALLEYS; REQUIRING A PERMIT AND FEE; IMPOSING REQUIREMENTS; PENALITIES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SUNDANCE, CROOK COUNTY, WYOMING: SECTION 1: GENERAL REGULATIONS 3-1-025 EXCAVATIONS — PERMIT REQUIRED It shall be unlawful for any person, company or corporation to dig in any street or alley for any purpose not authorized by ordinance, without a written permit from the City on a form provided by the City. In an emergency, during non -working hours of the City, upon notification to the City, oral permission may be given to dig but a written permit must be secured the first working day City hall is opened. 3-1-026 EXCAVATIONS — PERMIT FEE AND TIME LIMIT The permit fee for a street or alley excavation shall be as established from time to time by the City Council by resolution and shall be paid at the time of the application. If the • application is denied, the permit fee shall be refunded to the applicant. Any permit issued is valid for thirty (30) days, but may be extended by the City under special circumstances. 3-1-027 EXCAVATIONS — PERMIT TO BE PRESENT ON JOB SITE The permit shall be on the job site at all times and will be shown to any City employee or official when requested. 3-1-028 EXCAVATIONS —ASPHALT CUTS Any time asphalt is involved In an excavation, the asphalt shall be machine cut a minimum of eighteen (18) inches back from the edge of the excavation and a square edge cut must be made. Such excavation shall be held to a minimum width. 3-1-029 EXCAVATIONS — BACKFILL AND COMPACTION Any time an excavation is made in a street or alley, backfill shall be compacted to meet the surrounding area except when the excavation is beneath or within three (3) feet of asphalt. The backfill shall be made from excavated material when the same is not frozen or muddy and shall consist of aggregate no larger than six (6) Inches. When such material is frozen or muddy it shall be removed from the site by the permittee and suitable material free from frozen or muddy material, shall be furnished. The material shall be placed in the trench or excavation in layers not to exceed six (6) inches and each layer shall be thoroughly tamped by hand or mechanical tampers to the satisfaction of the City. Where the original • surface was gravel, the permittee shall be required to make the top six (6) Inches of backfill out of road or street gravel. When an excavation is made under asphalt or within three (3) feet of the edge of asphalt, compaction shall be completed according to • specifications of the City. 3-1-030 EXCAVATIONS — PERMITTEE RESPONSIBLE The permittee shall be responsible for any settling of backfill for a period of one (1) year. Upon notice by the City that an excavation made by the permittee is settling, the permittee must replace any settling immediately. 3-1-031 EXCAVATIONS—CUT REPAIRS The permittee shall be responsible for restoring any pavement, curb, sidewalk or any other structure removed or damaged during the course of trenching activity, to its original condition or better. The permittee may be required by the City to place temporary patches or repairs as necessary to restore the traveled way during period of the winter or during weather conditions which will not allow permanent repairs. Where extensive trench activity will be performed and the permittee wishes to delay permanent repairs until final stages of the project, the City may require temporary surface repairs. The permittee shall be required to backfill all street cuts and provide at least temporary surface repair within twenty-four (24) hours of opening such cut in any arterial street, or forty-eight (48) hours in any lesser street classification or alley, unless otherwise allowed by the City. Upon backfilling any street cut and allowing access of such area to the public, the surface of such cut shall be maintained by ttie permittee until permanently restored. For purposes of this section, a temporary repair shall be constructed and maintained of any material which is not permeable to water, does not become unstable from common use of the particular • area and provides a surface smoothness consistent with posted vehicle speed, and does not constitute a hazard to the public. 3-1-032 EXCAVATIONS — UTILITY LOCATIONS Locations for utilities shall be the sole responsibility of the permittee. 3-1-033 EXCAVATIONS — PROTECTION OF PUBLIC Whenever the excavation obstructs through traffic on the streets or alleys in the vicinity, the permittee shall furnish, erect and maintain adequate barriers across the roadway; and shall furnish, post and maintain detour signs thereon and at the necessary adjacent street intersections sufficient for the guidance of traffic. Such barriers and signs shall be In accordance with the manual of Uniform Traffic Control Devices. The permittee shall provide access for emergency vehicles through the area, and shall be responsible to light the excavation if it is to be left open overnight. 3-1-034 EXCAVATIONS —PERMIT NOT REQUIRED Work done by employees of the City or by contractors hired by the City do not require an excavation permit. • 2 • 3-1-035 EXCAVATIONS — UTILITY CORRIDORS Whenever possible, utility corridors will be used In streets and alleys as follows: In all streets and alleys running in an East-West direction power lines shall run on the Northern side and telephone, cable TV and other media lines shall run on the Southern side of the street or alley and at least two feet from any water or sewer line. In all streets and alleys running North-South direction, power lines shall run on the Eastern side and telephone, cable TV, and other media lines shall run on the Western side of the street or alley and at least two feet from any water or sewer line. Once Installed, the permittee shall provide record drawings labeled "as built" showing the location of such utilities and the "as -built" drawing shall be acknowledged as correct by a designated official or employee of the City charged with such record keeping. (See attached Exhibit for sample). 3-1-036 LIABILITY Every person having placed any alteration in the right-of-way, road, alley or highway, or making any excavation therein under the provisions of this chapter, shall be responsible to all persons for injury or damage due to negligence by reason of the presence of such alteration or excavation in the public right-of-way and also shall be liable to and hold the City harmless in the event that the City shall be held responsible for any accident, claims or otherwise arising out of the presence of any such alteration or excavation in the public right-of-way. SECTION 2: PENALITIES Any person found guilty of violating any of the provisions of this amended ordinance shall be deemed guilty of a misdemeanor and shall be punished according to the provisions of Ordinance No. 1, 1983. Any person failing to comply with any provision of this amended ordinance which requires restoration or repair by the City will be liable for the actual costs of any such restoration or repair. SECTION 3: REPEALING ALL ORDINANCES IN CONFLICT HEREWITH The last two sentences of Ordinance No. 3, 1986, Section 7 are in conflict with this ordinance and are hereby repealed. Ordinance No. 5, 1987, Sections 3-1-025 through 3- 1-034 are in conflict with this ordinance and are hereby repealed. Any other ordinance or part of ordinances in conflict with this ordinance are hereby repealed. SECTION 4: SEVERABILITY If any provision of this ordinance shall be held invalid, its validity shall not affect any other provision of this ordinance that can be given effect without the invalid provision, and for this purpose the provisions of this ordinance are hereby declared to be severable. SECTION 5: EFFECTIVE DATE • This ordinance shall be in full force and effect from and after its passage, approval, and publication. 3 PASSED, ADOPTED AND APPROVED this 3d day of February, 2003. CITY OF SUNDANCE BA ATTEST: ES A. �R, MAYOR 0 9 val a JM � miziipqRzl;i 0. (SEAL) 151 reading December 2, 2002 2nd reading January 6, 2003 3rd reading February 3, 2003 Publish February 20, 2003 I 'i; L 4 11/19/2002 17:10 PAX 1 307 283 2033 Bearlodee Limited Inc W, • BEARLODGE� LTD , , INC,)O Consulting Engineers & Land Surveyors P.O. Box 130, e11 Main St., Sundance, WY 82728 (307) 283.3833 Ppb: J o�u: Cneektd: Q000 t , .�1_1 `r i- .. .. _.,. ...�`... ...` ._ I .1 r_.. .i . _._.._�.. , I ProNet I I awnu Qrdtr\o.nc.'e- Il) 1002 r