Wyoming Digital Archives

 
��    			74-  Meeting Su i  t1_aiicc,    ,  _  1.1

    		Doug Carter called the meeting to order at 7:03 pm

    		Members present were: Doug Carter, John Kiplinger, Fred Altaffer, Keith

    		Lambert, and Steve Lenz.  Absent were: Marvin Massey & Mark Hinz

   						NEW BUSINESS

 			A)  Brad and Lorie Marchant: 394 Canyon Rd.  The Marchants were present to

      			discuss a permit request to install a UBC modular home on their land on the

      			Upper Canyon Rd.  Also present were representatives from Friendship

      			Homes of Minnesota, who sold the Marchants the home.  Discussion

      			followed that included the reps providing paper work showing the modular

      			was IBC compliant and NEC regulation approved.  The planning committee

      			was assured that the home was not a HUD or a manufactured home with

      			trailer frames and/or axels that would stay under the home on site.  Fred

      			moved, Keith seconded and the motion passed with the language that the

      			home delivered to the Marchants would meet or exceed IBC code and

      			regulations.

 			D) Chapel of Faith: 116 S. 3`d street/117 S. 3rd street.  Jon Davis was present to

      			represent the church with a permit request to build a 6X14 awning/entry on

      			the west side of the church.  Since the building is built at the edge of the

      			City's required setback, a variance would be required.  John Kiplinger, City

      			Manager, had no problem with the request since it would not affect drainage

      			or traffic and he recommended approval.  Fred moved, Keith seconded and

      			the motion passed for the request to be sent on to the City Council for final

      			approval on Monday, June 2.

 			E) Bart Adema: 606 E. Cleveland.  Mr. Adema was present to request

      			permission to set a 2006 "park model" home on the concrete pad at this

      			address for at least a period of 1 to 2 years.  All adjacent landowners were

      			contacted: some signed off on the necessary paperwork and none of the

      			others noted an objection on their forms.  The park model unit will be

      			installed to abide by the required setbacks.  Steve moved, Keith seconded

      			and the motion passed for the request to be sent on to the City Council for

      			final approval on Monday, June 2.

 			(*) Dave		, new Longhorn Bar owner, was not on the agenda, but he

 			was present to ask the planning committee questions regarding the current

 			Longhorn Bar property, the required City building codes he needed to follow,

 			construction material types the City would accept for renovating the current

 			facility and to discuss building an addition on the East side of the existing

 			structure at a later date.  The Committee discussed and answered the questions

 			regarding this property.  No action was desired or taken at this time.

 			B) Conrads Big Signs: Travel Plaza Eastside of Sundance.  The sign permit

 			request was to replace the existing BP signage with Conoco signage.  The

 			application was in order and the request was in compliance with the sign permit

 			rules and regulations.  Steve moved, Keith seconded and the motion passed.

 			F) Jeanette Mathis: 1801 E. Cleveland.  The permit request was for a sun room

 			addition to an existing deck on the home/property.  As the addition request met

 			all requirements, Fred moved, Keith seconded and the motion passed.

 			G) Warren Oyler: 612 E. Main St.  The permit request was for a 1  %2 story

 			addition to the south side of the existing house.  All requirements were met and

 			Steve moved, Fred seconded and the motion passed.

 			H) Jeff Hodge: 407 Boxelder.  The permit request was for a front and rear deck.

 			All setbacks were met, so Keith moved, Steve seconded and the motion passed.

 			I) Steve Lenz: 423 Cleveland.  The permit request was for a deck and stairs to

 			develop (2) new office spaces on the West side of the building housing Subway.

 			All requirements were met and Keith moved, Fred seconded, motion passed.

 			Steve abstained from voting due to a conflict of interest.

 			J) Reggie Gaylord: 214 Alden St.  The permit request was for 49'X33' fence.

 			All setbacks and fence height restrictions were addressed, so Keith moved, Fred

 			seconded , and the motion passed.  Steve abstained from voting due to a

 			potential conflict of interest.

 			K) Waneta Sell: 213 N. 6"' Street.  The permit request was for a 37' fence

 			extention on the property.  John will visit with Ms. Sell to ensure the fence

 			height restrictions would be addressed.  Fred moved, Keith seconded and the

 			motion passed with this stipulation.

 			L) Dione Moon: 304/306 N. West Street.  The permit request was for

 			50X80X22 fence.  John will visit with Ms. Moon to ensure the fence height

 			estrictions would be addressed and the fencing along the property lines next to

 			the Canyon road easement would be addressed.  Steve moved, Keith seconded

 			and the motion passed with these stipulations.

 			M) Jerry Schloredt: South 6th Street.  The permit request was for a 13'X12'

 			fence.  All fence height and other permit requirements were addressed.  Fred

 			moved, Steve seconded and the motion passed.

      			UNFINISHED BUSINESS

 			1) Lee Middleton of Energy Plaza Subdivision submitted covenants for the

      			subdivision for the City to review.  The Planning Committee found the

      			following recommendations and sent them forward to the City Council:

      			Section 1) Dewellings:  Language to say "8 years or newer model" rather

 			than setting a date that would cause issues with aged or possibly dilapidated

 			trailer units being moved into the Subdivsion in the future.

      			Section 5) Vehicles:  Language to say "No vehicles parked on the street" in

 			addition to limiting the number of vehicles that can be stored on the property.

 			Also, the Planning Committee wanted the City Council to inquire as to whether

 			the old sewer easement will be formally abandoned, when the existing sewer

 			line is routed (West to East) across north edge of the Energy Plaza Subdivision

 			and tied into the sewer line on North Government Valley Road.

 			2) Roy & Linda Stagemeyer: Discussion was held concerning the future

      			easement agreement between Roy & Linda Stagemeyer and the City of

      			Sundance out on the Haul Road.

    		Meeting was adjourned at 9:15 pm.

      			May meeting minutes by111

										��r

     							Date  	��.��;,

 

Wyoming State Archives 2301 Central Ave, Cheyenne, WY 82002 | (307) 777-7826

Wyo.Gov | Citizen | Business | Government | Visitor | Privacy Policy | Contact Us