Sheriffs Office  			Dispatching&Small Claims Fee		1020.00

     			878-NCPERS Group Life Insurance 		Life Insurance					124.00

     			Deckers   						Babe Ruth &Little League 			102.62

     			EFTPS     						Fica, Federal Withholding			8541.79

     			Energy Electric   					Pool System Repairs 				15.77

     			Energy Laboratories, Inc.      			Water Testing					300.00

     			Flexshare Benefits      				Cafeteria&Flex Fees     			1041.04

     			Gates, Rodney   					Rally Event    					137.70

     			Hawkins Water Treatment    			Water Chlorine  					5.00

     			Hillside Pharmacy       				Office Supplies					33.85

     			Hooper, Gay      					Janitorial Services   				100.00

     			Jundt, Tammy    					Utility Deposit Refund				24.53

     			Karen's Delivery Service 2     			Water Supplies					23.50

     			Kiplinger,John   					Travel Training					63.51

     			Lambert, Cindy  					Arts&Crafts Supplies				23.76

     			Lenzes Printing& Laminating 			Pool Misc. Expense   				18.00

     			Leslie's Amoco   					Shop,Police,Landfill Fuel&Park Equipment  	1951.68

     			Lexis Nexis       					Police Supplies       				111.00

     			M&M Sanitation  					Park Toilet Rental     				85.00

     			Mark L Hughes Law Office    			City Attorney Retainer     			1200.00

     			Northwest Pipe Fittings 				Street Storm Supplies,Water Supplies	3083.52

     			Orchard Trust Company       			Deferred Comp.      				420.00

     			Paintbrush Industrial Services			Rally Day Toilet Rental    			2039.59

     			Payroll     						Salaries     					28334.38

     			Powder River Energy   				Electricity    					4672.84

     			Powder River Energy Corp. 1 			Electricity     					1176.36

     			Range Telephone       				Telephone     					958.76

    			Rocky Mountain Information Network       	Police Misc. Expense				50.00

     					" 

   				" 

     											" 

    						"   						1111

     								AMENDMENT TO THE

       							COOPERATIVE AGREEMENT

       									FOR THE

   					PRELIMINARY ENGINEERING,UTILITY ADJUSTMENTS

  								AND CONSTRUCTION OF

      							ON-SYSTEM ENHANCEMENTS

      												Federal Project STP-E-0607-00(033)

      												Sundance Streets (WCL to ECL)

      												Crook County

      			THIS AMENDMENT,made and entered into this 1��h '  day of St v' 1t( , 2005, is

   		pursuant to the COOPERATIVE AGREEMENT,made and entered into the 17  day of April,2003

   		by and between the WYOMING DEPARTMENT OF TRANSPORTATION, hereinafter referred

   		to as the "State", and the TOWN OF SUNDANCE,hereinafter referred to as the "Town".

     			WHEREAS, the purpose of this Amendment is to amend the project description for this

   		project; increase the State's maximum contribution; update overhead percentage rates and modify

   		the costs throughout the Agreement and on Exhibit"B"; and

     			The following Paragraphs B and C,of the above-mentioned COOPERATIVE AGREEMENT

   		are hereby amended to read:

   		B.       Project Description:

     			The proposed project involves a decorative urban lighting system.

   		C.       Participation of Project Costs:

      			1.       The State has authorized a maximum of$250,000.00 in Federal Aid Enhancement

					funds  to  be used towards  the  cost  of preliminary  engineering,  right-of-way

					acquisition, utility adjustments, construction and construction engineering which

       				must be matched/overmatched with funds provided by the Town on a 90.49/9.51

       				percent ratio.  It is understood and agreed by the parties that 90.49 percent of the

       				preliminary engineering,utility relocations,construction and construction engineer-

					ing will be paid with Federal Aid funds.

     			2.       The Town agrees to match the Federal Aid funds at the rate of 9.51 percent of the

					cost of preliminary engineering, utility adjustments, construction and construction

					engineering. Excluding any unforeseen overruns or underruns,the estimated cost of

       				this project is $378,745.00 which includes $78,650.00 for engineering, $13,371.00

					for engineering overhead and $224.00 for administrative overhead, as shown on

       				Exhibit "B" and which by this reference is hereby made a part of this Agreement.

       				The Town agrees to reimburse to the State any funds above those authorized by the

					State and matched by the Town necessary to build this project.   The Town's

										Page 1 of 3

     											" 

   										" 

	r  					"    						" ,

					estimated share of these costs is$128,745.00. Costs for reimbursable utility work not

					owned by the Town are not shown and will be in addition to the identified costs

       				previously shown. Any costs exceeding the$250,000.00 maximum amount paid by

       				the State shall be borne by the Town.

     			3.	The Town agrees to pay for all actual costs incurred for engineering overhead utilized

					during construction of this project. The engineering overhead consists of,but is not

					limited to,communications,postage,printing,advertising,rentals,utilities,repairs,

					and services on buildings and equipment,professional services-i.e.,service contracts,

					equipment parts and supplies, materials and supplies, non-depreciable items on

					equipment, computer processing, depreciation on equipment, occupancy costs of

       				building space, dues, subscriptions, fees, and insurance bonds. These costs cannot

       				be paid for with Federal Aid funds. The estimated cost is $13,371.00.

     			4.	The Town further agrees to reimburse the State for 3.0 percent of the Town's share

       				of preliminary and construction engineering for the administration of the Federal Aid

       				program for the Town. The estimated Town share of these costs is $224.00.

   		Special Provisions:

     			a.	Same Terms and Conditions.  With the exception of items explicitly delineated in

       				this Amendment, all terms and conditions of the Agreement between the State and

       				the Town, including but not limited to sovereign immunity shall remain unchanged

       				and in full force and effect.

  							"INTENTIONALLY LEFT BLANK"

										Page 2 of 3

   						i   						i

     			IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed

   		under their respective seals through their duly authorized officers the day and year first above

   		written.

   		ATTEST:  							TOWN :   'UND     CE, WYOM I�%   :

   											B. :	L ,_   "  .4    &   iii

  													James A. Miller, Mayor

						Title

   		(SEAL)

      															" 

   		ATTEST:    		p  				WYOMING DEPARTMENT OF TRANSPORTATION:

  		2h(    							By:

												et

					portation Commission     		s.     Del McOmie, P.E., Chief Engineer

       				of Wyoming

   		(SEAL)

   		Approved as to form:

   		By:   bilAA [U"

     			Assistant  	ey General

     			State of/Wyoming      									Date revised: 7-27-05

										Page 3 of 3

   						i   						r

      	" 

   									EXHIBIT "B"

    							Federal Project STP-E-0607-00(033)

 								Sundance Streets (WCL-ECL)

    									Crook County

     								Revised-July 27, 2005

  		Costs were prepared by the State.

       				Item     										Cost

  		Estimated Construction Costs    						=   	$286,500.00

  		Preliminary Engineering   							=      	50,000.00

   		10% Construction Engineering  						=      	28,650.00

  		Total Construction Costs  							=    	365,150.00      [1]

  		Town's Engineering Overhead:  (nonparticipating)

  		(78,650.00) (0.1700)								=      	13,371.00      [2]

  		Town's Administrative Overhead

  		(78,650.00) (0.0300) (0.0951)   						=  		224.00      [3]

  		State's Maximum Portion 							=    	250,000.00      [4]

  		Town's Portion (Match Percentage)

  		(365,150.00) 0.0951 								=      	34,726.00

  		Town's Match/Overmatch= [1] + [2] + [3] - [4]   			=     	128,745.00

  		Total Project Costs = [1] + [2] + [3]  					_   	$378,745.00

  		NOTE:  	All costs shown are rounded to the nearest even dollar.

       				The above figures are for estimating purposes only and are

       				subject to revision throughout the life of this project.

       				Federal funding is provided through CFDA#20.205,

       				Highway Planning and Construction.

 