Wyoming Digital Archives

 
First Page
quipment     				45.95

      			Salyards, Clinton D.     				Rally Event Travel   				193.05

      			Servall Uniform/Linen Company     		Administration Janitorial      			74.92

  							0

  														" 

      			Stutzman, Leann					Janitorial Services   				175.00

      			Summit Signs &Supply, Inc.  			Street-Supplies     				1192.40

      			Sundance Dillon's Hardware Inc.    		Pool/Shop-Supplies/Admin-Janitorial    	197.27

      			Sundance Electric, Inc.				Fire-Building Maint/Lagoon/Wtr-Repairs       2698.75

      			Sundance Office Supply       			Admin-Office Supplies				38.00

      			Sundance State Bank  				Direct Deposit Fees    				6.96

      			Sundance Subway      				Rally Event/Summer Rec-Miscellaneous 	82.37

      			Symetra Life Insurance Company   		Long Term Disability Insurance   		297.18

      			Terry's Auto      					Street/Garbage-Equipment&Maint.     	358.87

      			The Pool &Spa Center				Pool-Supplies       				1579.53

      			The Sundance Times  				Administration Advertising  			715.00

      			Tongue River Cable TV Inc.  			Administration-Housing Authority  		46.00

      			Top Office Products Inc.       			Admin-Copy Machine/Office Supplies   	155.98

      			Town of Upton   					Landfill-Integrated Solid Waste Plan     	629.11

      			Tracy Motor Company 				Shop/Fire Department-Supplies  		489.28

      			U. S. Postal Service    				Bulk Mailing Fee, Stamps  			244.24

      			VISA       						Fire-Travel &Training/Supplies   		596.63

      			WAMCAT						Admin-Association Dues   			100.00

      			West, Tyrel       					Utility Deposit Refund  				4.90

      			WY State Treasurer's Office  			Unclaimed Property    				2.82

      			WYDOT-Motor Vehicle Services     		Vehicle Licenses     				135.00

      			Wyoming Department of Transportation   	WYDOT-Street Lights    			12728.76

      			Wyoming Retirement System 			Salaries      					5281.40

      			Wyoming Workers Compensation   		Salaries       					1064.77

      			Xpediter Technology   				Police-Computer Maintenance    		500.00

      			Yemington, Robert E. Dba Sundance Equipmen Landfill- Equipment& Maintenance		98.38

 																		286784.90

      			All bills were paid in/  full to the claimants.

 										y��

      			Dated:	0 '1ak  	�2   2(��o/

      			Mayor:    4  ��,0    .    ..      -/_/

      			City Council:	a r   rk-a-   -

 							1      2  	'

      			City Council 		v      J

      			City Council:   (a.c...

									l

      			City Council:C\\     	\

     										1110

  		AAClerk-Treasu   "        dC %ic    0      r'

      								Resolution NO. 17,2008

      	RESOLUTION AUTHORIZING THE FILING OF AN APPLICATION FOR AN AMENDMENT

      	TO THE WYOMING WATER DEVELOPMENT COMMISSION PROJECT AGREEMENT FOR

      	THE RECONSTRUCTION OF THE CITY OF SUNDANCE'S COLE 3A WELL

      	WHEREAS,the City of Sundance is currently reconstructing the existing Cole 3A well with funding

      	assistance from the Wyoming Water Development Commission in the form of a 67%Grant/33%Loan.

      	WHEREAS,the existing contract to drill and case the well has encountered unexpected difficulties with

      	lost circulation during drilling.

      	WHEREAS,the cost associated with the unexpected lost circulation issues is more than can be absorbed in

     	the current project budget.

     	WHEREAS,additional engineering and geology fees are required to solve the problems created by the lost

     	circulation issues.

      	WHEREAS,the lost circulation problems that have been encountered during drilling will cause a change in

     	the procedure and cost to cement the casing.

     	WHEREAS,the additional funding to be requested shall be$86,200,with$15,500 attributed to inflation of

     	the well completion cost(pump,pipeline,electrical), $26,400 attributed to additional engineering and

      	geology,and$44,300 attributed to Change Orders required to pay for Lost Circulation costs, Drilling

      	Method Alteration and to solve problems with cementing through the lost circulation zones that have been

      	encountered during drilling(this Change Order cost includes only the changes that have been or are

     	proposed to be made to the construction contract that are beyond the original project contingencies).

      	NOW,THEREFORE,BE IT RESOLVED BY THE GOVERNING BODY OF THE CITY OF

      	SUNDANCE,that Bearlodge Limited,Inc. be directed to make application to the Wyoming Water

      	Development Commission for an amendment to the existing Project Agreement for additional project

      	funding in the amount of$86,200 to allow for completion of the project as previously planned.

      	PASSED,APPROVED AND ADOPTED THIS     co    day of S/0    .r1aL{/    2008.

   									CITY OF SUNDANCE

   									Fred D. Tschetter,Mayor

      	(SEAL)

      	ATTEST:

      						." 

       				(11)   	,

      	Ci   Clerk

      	(SEAL)

 
First Page

Wyoming State Archives 2301 Central Ave, Cheyenne, WY 82002 | (307) 777-7826

Wyo.Gov | Citizen | Business | Government | Visitor | Privacy Policy | Contact Us