��"  ORDINANCE NO. 5, 1987 

AN ORDINANCE REGULATING STREETS; USE OF; SETTING OF DIRECTIONAL 

DESIGNATIONS; AND THE OPENING AND EXCAVATION OF STREETS AND.ALLEYS; 

REQUIRING A PERMIT AND FEE; IMPOSING REQUIREMENTS; PENALTIES; 

REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; SEVERABILITY AND 

PROVIDING FOR AN EFFECTIVE DATE 

BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF SUNDANCE, CROOK 

COUNTY, WYOMING: 

Chapter 3: THIS ORDINANCE IS ENACTED TO PROVIDE FOR THE PUBLIC 

SAFETY AND TO REGULATE CONSTRUCTION IN, AND USE OF, 

THE PUBLIC STREETS 

SECTION 1: GENERAL REGULATIONS 

3-1-001 DEFINITIONS 

a. Applicant: Any person making a written application to the 

Town of Sundance for a permit hereunder on forms provided 

by the town. 

b. Contractor: Any person who has been granted and has in 

force a permit issued hereunder. 

c. Excavation work: The excavation and other work permitted 

under an excavation permit and required to be performed 

under this permit and where a trencher, backhoe, boring 

machine, jack hammer, cable plow or any other method or 

equipment is used to do such work. 

d. Street: Any street, alley, highway, avenue or other public 

way dedicated to the public and operated by the town. 

e. Boulevard: That"  portion of a dedicated street between the 

property line and the edge of the traveled way. 

f. Sidewalk: A buildup of material at or above ground level 

as a walkway for pedestrians at the side of a street. 

3-1-002 OCCUPANCY OF STREETS UNLAWFUL 

It shall be unlawful for any person to fence off or in any other way 

restrict the public use of streets in any way not specifically 

authorized by ordinance. This applies to undeveloped, as well as, 

developed streets. 

3-1-003 ASSIGNMENT OF DIRECTIONAL DESIGNATIONS 

"  The streets of the town shall have North-South and East -Hest 

designations as follows: 

. i. All north -south streets north of Cleveland Street shall 

have a North designation and all those south of Cleveland 

Street shall have a South designation. 

it. All east -west streets north of., and including Cleveland 

Street shall have an East designation if they are east of 

West Street and:a West designation if they are west of West 

Street. 

iii. All east -west streets south of Cleveland Street shall have 

an East designation if they are east of 1st Street and a 

West designation if they are west of 1st Street. 

"  

3-1-004 STREET NAMES 

Official street names shall be those shown on the official town map 

as may be adopted by the town council and as may be changed from 

time to time by the town council. 

3-1-005 BOULEVARDS - MAINTENANCE AND USE OF 

Boulevards shall be maintained by the abutting property owner. The 

boulevard may be used as an extension of the abutting property 

owner's yard. No structures, either permanent or temporary, may be 

placed at any place on a dedicated street. 

3-1-006 BOULEVARDS - TREE AND SHRUB PLANTING 

Trees and shrubs may be planted in the boulevard subject to the 

following restrictions: 

i. On corner lots nothing other than grass may be planted on 

the angle formed by the extension of the two property 

lines. 

it. On streets with less than a sixty foot dedication, no trees 

or shrubs will be planted on the boulevard. 

iii. On streets of le than sixty feet dedicated width, trees 

and shrubs may be planter) but must be within a distance of 

10 percent of the total dedicated width from the property 

line. 4( 

iv. On corner lots no shrub of more than three feet in height 

will be allowed within fifty feet of the point of 

intersection of;the two street lines. 

3-1-007 BOULEVARDS - ABUTTING PROPERTY OWNER RESPONSIBLE FOR TREES 

AND SHRUBS 

The abutting property owner shall be responsible for all trees and , 

shrubs on the boulevard and shall keep them trimmed in such a manner: 

ass to not interfere with sight of drivers of vehicles ,and to 

protect the public safety. 

0 

3-1-008 BOULEVARDS - TO{':N MAY ORDER TRINNING AND/OR REMOVAL OF 

TREES AND SHRUBS 

If, within thirty days of receiving written notice from the town 

that trees or shrubs need to be trimmed or removed, the property 

owner has not complied with the written notice, the town will order 

the wort: done and the property owner shall be billed for the cost of 

such work. 

3-1-009 SIDEWALKS - PERM:IT REQUIRED 

No person shall construct, reconstruct or remove sidewalk within the 

town without a permit from the town on a form provided Liy the town. 

3-1-010 SIDEWALKS - PERMIT I" 'EE 

The fee for a sidewalk construction permit shall be as established 

from time to time by the town council by resolution and shall be 

paid at the time of application. If the application is denied, the 

permit fee shall be refunded to the applicant. 

3-1-011 SIDEWALKS - CONSTRUCTION REQUIREMiENTS 

{ 

"  All sidewalks shall beEconstructed in accordance with Section 509 of 

the Wyoming Public Work`" s Standard Specifications. Sidewalks shall 

be constructed to a grade as determined by the town. 

3-1-012 SIDEWALKS - TO BE MAINTAINED IN SAFE CONDITION 

Every sidewalk shall be maintained in a safe condition by the 

property owner abutting the sidewalk. Sudden deviations in grade or 

slope, cracks or extreme rough surfaces are considered unsafe. 

3-1-013 SIDEWALKS - MAY BE ORDERED REPLACED 

The town shall order any sidewalk it has determined to be unsafe to 

be replaced by written notice to the property owner abutting the 

defective sidewalk. 

3-1-019 SIDEWALKS - TOWN MAY REPLACE 

If a sidewalk ordered replaced according to 3-1-013 above is not 

replaced within thirty days of notice, the town will order the work 

done and bill the cost of such work to the abutting property owner. 

3-1-015, SIDEWALKS - TO BE KEPT CLEAR OF SNOW AND ICE 

Every sidewalk within the town shall be kept clear of ice, snow or 

"  slush by the abutting property owner whether the lot be vacant or 

have an occupied or unoccupied building on it. 

"  3-1-016 SIDEWALKS - TOWN MAY ORDER WORK DONE AND BILL THE ABUTTING 

PROPERTY OWNER 

If, after personal contact by a town employee, the property owner 

has not cleared the sidewalk within 12 hours, the town may order the 

work done and bill the cost to the property owner. 

3-1-017 SIDEWALKS - SALT OR CORROSIVE AGENTS NOT TO BE USED 

No person shall use salt or any other substance corrosive to 

concrete as a means to control ice, snow or slush on any sidewalk 

within the town. 

3-1-018 CURB AND GUTTER - PERMIT REQUIRED 

No person shall construct, reconstruct or remove curb and gutter 

within the town without a permit from the town on a form provided by 

the town. 

3-1-019 CURB AND GUTTER - PERMIT FEE 

The fee for a curb and cutter construction permit shall be as 

established from time toy time by the town council by resolution and 

shall be paid at the time of the application. If the application is 

denied, the permit fee Aall be refunded to the applicant. 

"  3-1-020 CURB AND GUTTER, - CONSTRUCTION REQUIREMENTS 

All curb and gutter shall be constructed in accordance with Section 

503 of the Wyoming Public Works Standard Specifications. Type A 

curb and gutter as shown in Standard Drawing 503-01 shall be used in,, 

the built up area of the town with driveway cuts to be built as 

shown in Standard Drawing 504-02. In a new development where 

buildings are not present, Tyne B curb and gutter as shown in 

Standard Drawing 503-01 may be used. Curb and gutter shall be i 

constructed to a grade as determined by the town. 

3-1-021 CURB AND GUTTER - TO BE MAINTAINED IN SAFE CONDITION 

Every curb and gutter shall be maintained in a safe condition by the!.' 

property owner abutting the curb and gutter. Sudden deviations in 

grade or slope, cracks or extremely rough surfaces are considered-, 

unsafe. 

3-1-022 CURB AND GUTTER - MAY BE ORDERED REPLACED 

The town shall order any;curb and gutter it has determined to be 

unsafe to be replaced by;written notice to the property owner 

abutting the defective curb and gutter. 

i 

3-1-023 CURB AND GUTTER'- TOWN MAY REPLACE 

"  If a curb and gutter ordered replaced according to 3-1-022 above is 

not replaced within thirty days of notice, the town will order the 

work done and bill the cost of such work to the abutting property 

owner. 

3-1-024 UNPAID BILLS FOR WORK DONE BY TOWN - LIEN MAY BE FILED 

If, after thirty days have passed since the billing date for work 

done under 3-1-000, 3-1-014, 3-1-016 or 3-1-023 .above, the bill 

remains unpaid, the town may file a lien for the amount of the bill 

plus costs against"  the property which shall be collected as any 

other assessment. 

3-1-025 EXCAVATIONS - PERMIT REQUIRED 

It shall be unlawful for any person, company or corporation to.dig 

'in any street for any purpose not authorized by ordinance, without a 

written permit from the town on a form provided by the town. In an 

emergency, during non -working hours of the town, upon notification 

of the town, oral permission may be given to dig but a written 

permit must be secured the first working day the town hall is 

opened. 

i 

3-1-026 EXCAVATIONS - PERMIT FEE 

The permit fee for a street excavation shall be as established from 

time to time by the town1council by resolution and shall be paid at 

"  the time of the application. If: the application is denied, the 

permit fee shall be refunded to the applicant. 

3-1-027. EXCAVATIONS - PERMIT TO BI: PRESENT ON JOB SITE 

i 

The permit shall be on the job site at all times and will be shown 

to any town employee or official when requested. 

o 3-1-028 EXCAVATIONS - ASPHALT CUTS 

Any time asphalt is involved in an excavation, the asphalt shall be 

machine cut and a square edge cut must be made. 

3-1-029 EXCAVATIONS - COMPACTION 

4: .. Any time an excavation is made in a street, back fill shall be 

compacted to meet the surrounding area except when the excavation is, 

within three feet of asphalt. When an excavation is made under 

asphalt or within three feet of the edge of asphalt, compaction 

shall be completed according to specifications of the town 

administrator. 

3-1-030 EXCAVATIONS - CONTRACTOR RESPONSIBLE 

i 

The contractor shall be responsible for any settling of backfill .for 

a period of one year. He must replace any settling immediately upon 

"  notice by the town that an excavation made by him is settling. 

"  3-1-031 EXCAVATIONS - REPLACING ASPHALT 

The town will replace asphalt removed in an excavation and the cost 

of such replacement shall be included in the cost of the permit. 

3-1-032 EXCAVATIONS - UTILITY LOCATIONS 

The contractor shall be responsible for all locations of utilities. 

3-1-033 EXCAVATIONS - PROTECTION OF PUBLIC 

The contractor shall be responsibly: for sufficient barricades to 

protect the public and shall be responsible to light the excavation 

if it is to be left open overnight. 

3-1-034 EXCAVATIONS - PERMIT NOT REQUIRED 

Work done by employees of the town or by contractors hired by the 

town does not require an excavation permit. 

3-1-" 035 WEIGHT RESTRICTIONS 

The town council may set weight restrictions for the town streets. 

3-1-036 PENALTIES +? 

"  Any person found guilty "of violating any of the provisions of this 

ordinance shall be deemed guilty of a misdemeanor and shall be 

punished according to the provisions of Ordinance No. 11 1983. 

SECTION 2: " REPEALING ALL ORDINANCES IN CONFLICT HEREWITH 

Any ordinance of the Town of Sundance in conflict herewith be and 

the same is hereby repealed. 

SECTION 3: SEVERABILITY 

Should the Courts of this State or the United States declare any 

section, provision, paragraph, clause, sentence, phrase or part of 

this ordinance invalid or unconstitutional or in conflict with any 

other section, provision, paragraph, clause, sentence, phrase or 

part thereof of this ordinance, then such decision shall affect only 

the section, provision, paragraph, clause, sentence, phrase or part 

thereof declared to be unconstitutional or unauthorized and shall 

not affect any other part of this ordinance. 

0 

SECTION 4: PROVIDING FOR AN EFFECTIVE DATE 

This ordinance shall be effective upon completion of all readings 

and other acts required by law. 

by: 

ATTEST: 

Town Clerk 

1st reading ,lune 1. 1987 

2nd reading July 6. 1987 

3rd reading September 8, 1987 

Publish on Octcber L 1987 

4s: 

p r: 

n ' 

N��tY 

i 

r 

f,d
 
Last Page

Wyoming State Archives 2301 Central Ave, Cheyenne, WY 82002 | (307) 777-7826

Wyo.Gov | Citizen | Business | Government | Visitor | Privacy Policy | Contact Us