��"  ORDINANCE NO. 12, 2002 

AN ORDINANCE AMENDING ORDINANCE NO. 5, 1987, THE OPENING AND 

EXCAVATION OF STREETS AND ALLEYS; REQUIRING A PERMIT AND FEE; 

IMPOSING REQUIREMENTS; PENALITIES; REPEALING ALL ORDINANCES IN 

CONFLICT HEREWITH; SEVERABILITY AND PROVIDING FOR AN EFFECTIVE 

DATE. 

BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SUNDANCE, CROOK 

COUNTY, WYOMING: 

SECTION 1: GENERAL REGULATIONS 

3-1-025 EXCAVATIONS   PERMIT REQUIRED 

It shall be unlawful for any person, company or corporation to dig in any street or alley for 

any purpose not authorized by ordinance, without a written permit from the City on a form 

provided by the City. In an emergency, during non -working hours of the City, upon 

notification to the City, oral permission may be given to dig but a written permit must be 

secured the first working day City hall is opened. 

3-1-026 EXCAVATIONS   PERMIT FEE AND TIME LIMIT 

The permit fee for a street or alley excavation shall be as established from time to time by 

the City Council by resolution and shall be paid at the time of the application. If the 

"  application is denied, the permit fee shall be refunded to the applicant. Any permit issued 

is valid for thirty (30) days, but may be extended by the City under special circumstances. 

3-1-027 EXCAVATIONS   PERMIT TO BE PRESENT ON JOB SITE 

The permit shall be on the job site at all times and will be shown to any City employee or 

official when requested. 

3-1-028 EXCAVATIONS  ASPHALT CUTS 

Any time asphalt is involved In an excavation, the asphalt shall be machine cut a minimum 

of eighteen (18) inches back from the edge of the excavation and a square edge cut must 

be made. Such excavation shall be held to a minimum width. 

3-1-029 EXCAVATIONS   BACKFILL AND COMPACTION 

Any time an excavation is made in a street or alley, backfill shall be compacted to meet the 

surrounding area except when the excavation is beneath or within three (3) feet of asphalt. 

The backfill shall be made from excavated material when the same is not frozen or muddy 

and shall consist of aggregate no larger than six (6) Inches. When such material is frozen 

or muddy it shall be removed from the site by the permittee and suitable material free from 

frozen or muddy material, shall be furnished. The material shall be placed in the trench or 

excavation in layers not to exceed six (6) inches and each layer shall be thoroughly 

tamped by hand or mechanical tampers to the satisfaction of the City. Where the original 

"  surface was gravel, the permittee shall be required to make the top six (6) Inches of 

backfill out of road or street gravel. When an excavation is made under asphalt or within 

three (3) feet of the edge of asphalt, compaction shall be completed according to "  

specifications of the City. 

3-1-030 EXCAVATIONS   PERMITTEE RESPONSIBLE 

The permittee shall be responsible for any settling of backfill for a period of one (1) year. 

Upon notice by the City that an excavation made by the permittee is settling, the permittee 

must replace any settling immediately. 

3-1-031 EXCAVATIONS CUT REPAIRS 

The permittee shall be responsible for restoring any pavement, curb, sidewalk or any other 

structure removed or damaged during the course of trenching activity, to its original 

condition or better. The permittee may be required by the City to place temporary patches 

or repairs as necessary to restore the traveled way during period of the winter or during 

weather conditions which will not allow permanent repairs. Where extensive trench 

activity will be performed and the permittee wishes to delay permanent repairs until final 

stages of the project, the City may require temporary surface repairs. The permittee shall 

be required to backfill all street cuts and provide at least temporary surface repair within 

twenty-four (24) hours of opening such cut in any arterial street, or forty-eight (48) hours in 

any lesser street classification or alley, unless otherwise allowed by the City. Upon 

backfilling any street cut and allowing access of such area to the public, the surface of 

such cut shall be maintained by ttie permittee until permanently restored. For purposes of 

this section, a temporary repair shall be constructed and maintained of any material which 

is not permeable to water, does not become unstable from common use of the particular "  

area and provides a surface smoothness consistent with posted vehicle speed, and does 

not constitute a hazard to the public. 

3-1-032 EXCAVATIONS   UTILITY LOCATIONS 

Locations for utilities shall be the sole responsibility of the permittee. 

3-1-033 EXCAVATIONS   PROTECTION OF PUBLIC 

Whenever the excavation obstructs through traffic on the streets or alleys in the vicinity, 

the permittee shall furnish, erect and maintain adequate barriers across the roadway; and 

shall furnish, post and maintain detour signs thereon and at the necessary adjacent street 

intersections sufficient for the guidance of traffic. Such barriers and signs shall be In 

accordance with the manual of Uniform Traffic Control Devices. The permittee shall 

provide access for emergency vehicles through the area, and shall be responsible to light 

the excavation if it is to be left open overnight. 

3-1-034 EXCAVATIONS  PERMIT NOT REQUIRED 

Work done by employees of the City or by contractors hired by the City do not require an 

excavation permit. 

"  

2 

"  3-1-035 EXCAVATIONS   UTILITY CORRIDORS 

Whenever possible, utility corridors will be used In streets and alleys as follows: 

In all streets and alleys running in an East-West direction power lines shall run on the 

Northern side and telephone, cable TV and other media lines shall run on the Southern 

side of the street or alley and at least two feet from any water or sewer line. 

In all streets and alleys running North-South direction, power lines shall run on the Eastern 

side and telephone, cable TV, and other media lines shall run on the Western side of the 

street or alley and at least two feet from any water or sewer line. Once Installed, the 

permittee shall provide record drawings labeled "as built" showing the location of such 

utilities and the "as -built" drawing shall be acknowledged as correct by a designated 

official or employee of the City charged with such record keeping. (See attached Exhibit 

for sample). 

3-1-036 LIABILITY 

Every person having placed any alteration in the right-of-way, road, alley or highway, or 

making any excavation therein under the provisions of this chapter, shall be responsible to 

all persons for injury or damage due to negligence by reason of the presence of such 

alteration or excavation in the public right-of-way and also shall be liable to and hold the 

City harmless in the event that the City shall be held responsible for any accident, claims 

or otherwise arising out of the presence of any such alteration or excavation in the public 

right-of-way. 

SECTION 2: PENALITIES 

Any person found guilty of violating any of the provisions of this amended ordinance shall 

be deemed guilty of a misdemeanor and shall be punished according to the provisions of 

Ordinance No. 1, 1983. Any person failing to comply with any provision of this amended 

ordinance which requires restoration or repair by the City will be liable for the actual costs 

of any such restoration or repair. 

SECTION 3: REPEALING ALL ORDINANCES IN CONFLICT HEREWITH 

The last two sentences of Ordinance No. 3, 1986, Section 7 are in conflict with this 

ordinance and are hereby repealed. Ordinance No. 5, 1987, Sections 3-1-025 through 3- 

1-034 are in conflict with this ordinance and are hereby repealed. Any other ordinance or 

part of ordinances in conflict with this ordinance are hereby repealed. 

SECTION 4: SEVERABILITY 

If any provision of this ordinance shall be held invalid, its validity shall not affect any other 

provision of this ordinance that can be given effect without the invalid provision, and for 

this purpose the provisions of this ordinance are hereby declared to be severable. 

SECTION 5: EFFECTIVE DATE 

"  This ordinance shall be in full force and effect from and after its passage, approval, and 

publication. 

3 

PASSED, ADOPTED AND APPROVED this 3d day of February, 2003. 

CITY OF SUNDANCE 

BA 

ATTEST: 

ES A. ��R, MAYOR 

0 9 val a JM �� 

miziipqRzl;i 

0. 

(SEAL) 

151 reading 

December 2, 2002 

2nd 

reading 

January 6, 2003 

3rd reading 

February 3, 2003 

Publish 

February 20, 2003 

I 

'i; L 

4 

11/19/2002 17:10 PAX 1 307 283 2033 Bearlodee Limited Inc 

W, 

"  

BEARLODGE�� LTD , , INC,)O 

Consulting Engineers & Land Surveyors 

P.O. Box 130, e11 Main St., Sundance, WY 82728 (307) 283.3833 

Ppb: 

J o��u: 

Cneektd: 

Q000 

t , .��1_1 `r i- .. 

.. _.,. ...��`... ...` ._ I .1 r_.. .i . _._.._��.. 

, I 

ProNet I I awnu 

Qrdtr\o.nc.'e- Il) 1002 

r 

 

Wyoming State Archives 2301 Central Ave, Cheyenne, WY 82002 | (307) 777-7826

Wyo.Gov | Citizen | Business | Government | Visitor | Privacy Policy | Contact Us